Marberk - Information for a Quotation
To provide an accurate proposal, we rely on clear project data.
The more definition we have, the more precise and efficient our pricing becomes.
Key Project Details
- Total square footage of all surfaces included in scope
- Interior, exterior, or mixed commercial areas
- Substrate types (drywall, CMU, steel, metal panels, concrete, doors/frames, ceilings, etc.)
- Existing surface conditions and any required preparation level
- Color count and finish requirements
- Coating system specifications (commercial, industrial, protective, epoxy, dryfall, elastomeric)
- Coat system expectations (standard 2-coat or multi-layer system)
- Access and logistics (lifts, restricted areas, off-hours, night shift, safety compliance)
Refinement Questions
- Are there sections requiring repairs, remediation, or specialized prep?
- Is there a preferred coating brand or system specification?
- Any performance requirements (durability, low-odor, chemical-resistant, anti-corrosion)?
- Do you have a target budget, timeline, or operational constraints we should align with?